Force & Flow Calibration Services in Malaysia
Accredited verification for Load Cells, Force Gauges, UTMs, and Air Flow Meters.
Critical Measurements for Malaysian Industries
In industries like construction and logistics, force measurement isn’t just about quality—it’s about safety. A drifting load cell on a crane or an inaccurate concrete compression machine can lead to catastrophic failures.
Atlantic Services brings laboratory-grade precision to the field. Whether you need Universal Testing Machine (UTM) verification in a Perak cement plant or Anemometer calibration for a cleanroom in Penang, our mobile team delivers traceable results. Our reports support compliance with DOSH (JKKP) safety requirements and ISO material testing standards.
Our Force & Flow Scope
Force Measurement (Tension & Compression)
Capabilities: Digital Force Gauges, Push-Pull Gauges, Load Cells (Crane Scales/Dynamometers), and Proof Load Testing.
Why Us: We handle high-capacity ranges suitable for heavy logistics and lifting equipment verification.
Material Testing Machines
Capabilities: Universal Testing Machines (UTM), Concrete Compression Machines, and Tensile Testers.
Why Us: We perform on-site calibration to ISO 7500-1 standards, verifying both force and speed/displacement accuracy.
Air Flow & Velocity
Capabilities: Anemometers (Vane/Hot Wire), Balometers (Hoods), and Wind Speed Indicators.
Why Us: Essential for HVAC balancing (NEBB) and cleanroom certification in semiconductor plants.
Precision Laboratory Flow
Capabilities: Rotameters (Variable Area), Mass Flow Controllers, and Bubble Flow Meters.
Why Us: Precise low-flow verification for laboratory and medical gas equipment.
Looking for Heavy Industrial Flowmeters? Visit our dedicated Flowmeter Calibration page.
WHY CHOOSE US FOR FORCE/FLOW?
- On-Site UTM Experts: We don't make you move your heavy material testers. Our team travels to construction sites and labs across Malaysia to calibrate in-situ.
- High-Capacity Reference Standards: We own traceable reference load cells capable of verifying heavy industrial scales and hoists.
- HVAC Compliance: Our airflow calibration supports NEBB and Cleanroom standards required by Malaysia’s high-tech manufacturing sector.
FAQ (Specific to Force/Flow)
Yes. We perform on-site calibration for compression machines used in civil engineering labs, ensuring compliance with construction material standards.
Please contact us with your specific tonnage; we regularly handle high-capacity industrial scales.
Standard turnaround is 3-5 working days. Pro Tip: We recommend scheduling this during your facility’s planned maintenance shutdown to avoid operational gaps.
Verify Your Lifting & Testing Equipment
Ensure your load cells are safe and your material tests are accurate.

